Every project has a Dashboard tab. It is not a fixed report: it is a grid of widgets you choose, arrange, and size.

The goal is one screen that answers your standing questions, so you stop rebuilding the same filter every Monday.

This is the part worth understanding first, because it is what makes a dashboard safe to fiddle with.

Layer Who sees it
Curated The sensible default dotby ships.
Project What a manager sets for the whole team.
Personal Your own arrangement, visible only to you.

Rearranging your dashboard does not change anyone else’s. If you want your version to become the team’s, save it to the project — and if you want your personal version gone, reset it and you fall back to the project layout.

Up to 30 per dashboard, each one or two columns wide, dragged into whatever order you like.

Stats — a compact row of counters. Pick which ones:

Total · Completed · In progress · Backlog · Completion % · Overdue · Unassigned · Due soon

KPI — one big number, for the metric you actually report on:

Total · Completed · Completion % · Overdue · Unassigned · Due soon · Created this week · Completed this week

The two “this week” metrics are the honest pair. Created against completed tells you whether the backlog is growing under you, which no single number can.

Widget Shows
Status Work per column
Priority How much is genuinely urgent
Workload Per assignee — the load chart
Modules Work per workstream
Label Work per tag
Widget Answers
Throughput How much are we finishing per week?
Velocity Is that rate steady, rising, or falling?
Scope Is work being added faster than we close it?
Burndown Will the current commitment land?

Each takes a window of 4, 8, or 12 weeks. Eight is the usual choice: long enough to show a trend, short enough that a reorganization three months ago does not distort it.

When none of the above is the cut you want, build one:

  • Dimension — status, priority, assignee, label, sprint, module, type, or creator
  • Measure — count of tasks, or the estimate total
  • Chart — bar or donut

“Estimate total by assignee, as a bar” is a workload chart that respects task size instead of pretending every task is equal.

Several widgets let you choose what you are counting.

  • Count treats every task the same. Simple, and usually wrong for planning.
  • Estimate sums the sizes. Better for “how much work is this really”, provided your team actually estimates.

If estimates are patchy, count is more honest than a total that silently ignores the unestimated half.

A widget for a feature you have switched off does not appear. Turn off sprints in a project and burndown goes with it, rather than sitting there drawing an empty chart.

The project dashboard is not the only rollup:

  • A project folder has its own dashboard — one row per project, totalled.
  • An initiative has a health trail, a delivery chart, and a projected finish date.
  • A sprint has its burn-up while it runs.

Use the project dashboard for “how is this project doing”. Use the other three when the question is bigger than one project.